The Haydon, London

Key Details

Main Contractor

Regal London

Location

London

Hire Duration

65 weeks

Machine Selection

Bocker MX1024 A17 (G)

Bocker LX2024 A42 (G)

Bocker Giant 20/38 (P/G) 

We were proud to partner with Regal London for the supply of the access package for The Haydon, a residential development consisting of 87 luxury apartments in Central London.

The project required a combination twin hoist package consisting of a 2000kg Bocker Giant 20/38 Passenger & Goods hoist paired with a 1700kg Bocker LX2024 A42 Goods hoist with car sizes of 1.5m x 3.8m and 1.5m x 4.2m respectively.

In addition, a further 1000kg Bocker MX1024 A17 Goods hoist was supplied to serve the internal staircore of the building.

The hoists were installed progressively to meet the requirements of site and all machines were maintained by NTP over their 65 week hire duration.