Gascoigne Estate, London

Key Details

Main Contractor

Willmott Dixon

Location

Barking, London

Hire Duration

54 weeks

Machine Selection

GEDA 1500ZZP GD (T/P)

Bocker LX2024 A34 (G)

Bocker Giant 20/38 (P/G) x3

This project at Gascoigne Estate covered multiple phases of the redevelopment program in Barking, London. We have been selected multiple years in a row to supply the construction hoists across the numerous phases and blocks that this project has covered.

Due to this project requiring both Goods Hoists and the ability to transport personnel across different areas of the site, we supplied a combination of Goods Hoists, Transport Platforms and Passenger & Goods Hoists. The Bocker LX2024 machine comes in a variety of modular options, with Willmott Dixon opting for our A34 configuration to take advantage of the extended car size.

We also have a variety of options available for our GEDA 1500ZZP machines, with a number of gate options, extensions and ramp positions so that the optimal configuration can be found for your application. For this project our ‘GD’ option was chosen, this is supplied with a wide ramp to allow for larger loads to be moved into the hoist. They also opted for a roof extension on this machine to allow for even more maneuverability of materials on site.

Finally, the Passenger & Goods hoists supplied were our Bocker Giant 20/38 machines. These were also supplied with C gates and allowed for a variety of uses on site due to the ability to carry both goods and personnel. 

You can look at the progress of this site, as well as see one of our hoists in action by following this YouTube link.