Lodge Road, London

Key Details

Main Contractor

Regal Homes

Location

London

Hire Duration

66 weeks

Machine Selection

GEDA PH20/32 (P/G) x2

For this development, two buildings comprised 153 affordable sheltered units and 17 market sheltered units within Building 1 fronting Lodge Road.

NTP supplied a Twin GEDA PH20/32 Passenger & Goods hoist for this project with a safe working load of 2000kg. The machine served 14 landings with a top landing height of 42m. The machine was installed progressively over 3 separate visits as the building progressed.

We also supplied our state of the art Bluetooth landing call system that allowed the contractors on site to notify the hoist drivers when they required picking up from the various landings. 

The hoist was on site for a 66 week hire period and was an integral part of the project as the site had a very small footprint. They therefore needed a reliable machine that made distributing men and materials easy throughout the duration of the project. Due to the long hire duration NTP invested in new equipment for Lodge Road which was purchased ‘on spec’ for this project.