M3 Building, Manchester
Key Details
Main Contractors
Elite Scaffolding
Location
Manchester
Hire Duration
18 weeks
Machine Selection
Bocker MX1024 (G)
NTP were pleased to supply the access package for the refurbishment works at the M3 Building in Manchester for one of our valued customers.
For this application, our customer required a 1000kg goods hoist with low tie and base loadings. We provided one of our compact and versatile Bocker MX1024 goods hoists configured with a 1.4m wide C gate entry at ground level.Â
This machine provides a 1.7m x 1.4m platform size with a 1000kg SWL, allowing a range of materials to be transported safely to a number of landings. While not required for this project, the MX1024 is also available configured as a Transport Platform with optional extras such as a scaffold carrier and calling buttons where required.
As with all of our projects, large or small, NTP provided site specific installation drawings and loading calculations accompanied by a full risk assessment/ method statement following a detailed site survey.