Call 01832 273 060 or click here to

XQ7 Building, Greater Manchester

Key Details

Main Contractors

Denholm Industrial

Quality Fast Facades

Location

Greater Manchester

Hire Duration

110 weeks

Machine Selection

GEDA 1500Z/ZP ED (T/P)

NTP were pleased to be chosen by multiple contractors for the supply of hoists at the XQ7 regeneration project in Salford, Greater Manchester.  

NTP are supplying a total package of 5 GEDA 1500Z/ZP ‘ED’ Transport Platforms across the project. These provide the capability for the transport of personnel and materials, with a SWL of 2000kg and the option to transport up to 7 people.

As part of a phased installation programme, the first hoists were installed from March 2023 and will continue in service until May 2025. As with all of our machines, these are installed, maintained and dismantled by our own dedicated team of service engineers that operate nationwide.