We are selected by contractors of all sizes to deliver work on a diverse range of projects nationwide
Recent Projects
With a track record of delivering vertical access solutions on a diverse range of projects nationwide, NTP are selected by contractors of all sizes to meet their requirements. Below are a selection of recent projects that we are proud to have been a part of.
We are happy to have supplied the hoist package for Winvic Construction at their Bletchley View project in Milton Keynes, supplying an access package of 4 Goods hoists across multiple blocks.
The machines provided were all highly versatile Bocker LX2024 A34 Goods hoists which are capable of moving materials up to 24m/min, with a SWL of 2000kg each.
NTP were contracted to perform monthly inspections on each of these machines to ensure they were kept in good working order. In addition, we also provided operator familiarisation for competent operatives in the safe use of the hoists, supplying operator identification cards and stickers for those that had successfully completed this. This assisted site in the management of competent hoist operators in a busy environment.
NTP have enjoyed working alongside the project team and look forward to continuing to work with Winvic on future projects.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
We are delighted to have provided the hoist package for Hill Group UK for their project at Wood Street, Waltham Forest to assist in their development of 67 new homes along with the new Family and Homes Hub.
NTP provided our customer with our robust Bocker Giant 20/30 hoist, allowing site to take advantage of its 2000kg/ 28 person capacity along with our optional Bluetooth call system.
Due to the schedule on site, this machine was installed in multiple visits, allowing the site to have the flexibility needed to continue their works. The same treatment was required for the dismantle, with a total of 3 visits booked to take the machine out of site, scheduled around the needs of the project.
As part of our service package, this machine was maintained with monthly inspections, allowing us to address any possible issues before they arose, keeping the machine functional and in good working order.
Following each installation visit, a full LOLER Thorough Examination and weight test were carried out using certified test weights.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
This project at Gascoigne Estate covered multiple phases of the redevelopment program in Barking, London. We have been selected multiple years in a row to supply the construction hoists across the numerous phases and blocks that this project has covered.
Due to this project requiring both Goods Hoists and the ability to transport personnel across different areas of the site, we supplied a combination of Goods Hoists, Transport Platforms and Passenger & Goods Hoists. The Bocker LX2024 machine comes in a variety of modular options, with Willmott Dixon opting for our A34 configuration to take advantage of the extended car size.
We also have a variety of options available for our GEDA 1500ZZP machines, with a number of gate options, extensions and ramp positions so that the optimal configuration can be found for your application. For this project our ‘GD’ option was chosen, this is supplied with a wide ramp to allow for larger loads to be moved into the hoist. They also opted for a roof extension on this machine to allow for even more maneuverability of materials on site.
Finally, the Passenger & Goods hoists supplied were our Bocker Giant 20/38 machines. These were also supplied with C gates and allowed for a variety of uses on site due to the ability to carry both goods and personnel.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Our customer required a fleet of reliable Passenger & Goods hoists to assist in the regeneration project at New Garden Square, Birmingham. In order to meet the needs of site, NTP supplied 3x GEDA PH27/27 machines which were each fitted with a C Gate to allow for an additional access point to each machine.
These highly versitile hoists were installed in progressive visits, with the largest install reaching 14 floors. Winvic opted to use our supplied calling buttons which allowed each floor to communicate with the hoist driver when attention was needed. Not only does this save time on site, this provides an efficient solution for larger projects requiring a quick and easy way to call the hoist to their floor.
This project will result in the completion of up to 400 new homes. The wider development will go on to build a further 1200 homes as well as a mixture of commercial, retail and community spaces. We are proud to have supplied our machines on this project and look forward to working with Winvic again in the future.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Beam Park is a new neighbourhood in the south of the London Borough of Barking and Dagenham and the London Borough of Havering. It is named after the River Beam which forms the boundary between the boroughs. It will be served by Beam Park railway station in Havering. 2899 homes are planned, with 2166 in Barking and Dagenham and 733 in Havering. It will include a town centre in the Havering part of the development
NTP have supplied multiple machines on Beam Park ranging from fully enclosed Passenger & Goods machines to Transport Platforms depending on the requirements for each block
Most machines have been installed in multiple visits as the buildings have progressed. Transport platforms were selected on the smaller blocks and passenger & goods hoists on the higher blocks. The scheme so far has been a tremendous success for NTP and we have since been awarded the hoist package on the next phase of the Beam Park regeneration due to the service that we provide and the reliability / flexibility of our machines.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Bank House is the first phase of Pilgrim Place, a new office destination for Newcastle, which will provide over 40,000 sq.ft of new offices
The site occupies a prominent gateway position on one of Newcastle’s most important historic streets and offers an exciting opportunity to occupy a landmark building surrounded by new high quality public open spaces.
A large Bocker Giant 2038 passenger & goods hoist was supplied to Bank House. The top landing height was 69m with 14 landing gates. The lifting speed of this machine was 60mpm which ensured that men and materials were distributed to the relevant building levels quickly. The machine was tied into the core walls and was used until the internal lifts had been commissioned. NTP also provided weekly inspections and 6 weekly servicing due to the high duty cycle of the machine.
Another one of our success stories for a regular client. We have since secured future work from our client at Bank House due to the service level that we provide and the reliability of our machines.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
This refurbishment project at Salisbury Tower in Birmingham required a combination of Transport Platforms and Passenger & Goods Hoists to cover 22 floors. NTP supplied our customer with two GEDA PH machines, along with a Bocker LX2024 to meet site’s requirements. This tailored fleet was installed with additional C Gates on each hoist.
The modular design of the LX2024 provided allowed our customer to have further choice in configuration, as a number of different platform sizes can be provided to find the best fit. In this instance, our A25 model was chosen, and an additional C Gate was also supplied to provide an additonal entry point to the machine.
Long running projects like this one show the durability of our machines. Over the 77 week duration we continuously examined our hoists and provided weekly inspections to ensure everything is kept in good working order.
Due to the number of floors and nature of the works on site, our operations team worked together with our customer to decide on an installation and dismantle sequence. This allowed for the machines to be installed in stages. Each machine was installed in 5x seperate visits, with thorough testing carried out between each climb along with weight testing to ensure the safety of our hoists.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Situated next to Nottingham railway station, this state-of-the-art tower offers 389,000 sqft of grade A office space across 10 floors and will be the new UK Government Hub in Nottingham, which will be home to HM Revenue and Customs’ (HMRC) and other government departments. The development is set to be one of HMRC’s largest regional offices, accommodating more than 4,000 colleagues.
NTP supplied a twin machine for this project, consisting of 1 x LX4024 A51 goods only machine and 1 x LX2024 A51 fully enclosed Passenger & Goods machine.
The LX4024 A51 had a safe working load of 3000kg and a cage size of 3.0m x 5.1m which allowed the site to transport large stillages of glass up to the different levels of the building as required
The LX2024 A51 had a safe working load of 1700kg and a cage size of 1.5m x 5.1m and this was used to carry passengers only
Unity square was a very successful project for both NTP and our client, due to the successful delivery of the project we have secured future works on many large schemes for the hire of similar equipment.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection