We are selected by contractors of all sizes to deliver work on a diverse range of projects nationwide

Recent Projects

With a track record of delivering vertical access solutions on a diverse range of projects nationwide, NTP are selected by contractors of all sizes to meet their requirements. Below are a selection of recent projects that we are proud to have been a part of.

Avro Hollows, Manchester

The Avro Hollows Decarbonisation project in Newton Heath, Manchester consists of 4x high-rise tower blocks and we are proud to have been selected to provide the access package across all blocks.

So far, we have fully installed 2x of our new GEDA 1500Z/ZP Transport Platforms, both configured as I Platforms with 2000kg SWL.

Our operations and sales teams work in conjunction with site to ensure any requirements are met effectively from Site Visits all the way to completion. In order to meet the needs of site, these hoists have each been planned with progressive installations and dismantle works. 

This site was one of the first to use our brand new 2024 machines. We have heavily invested in equipment this year to offer a fleet of modern and realible construction hoists and we are happy to see these getting put to work!

The Avro Hollows Decarbonisation project in Newton Heath, Manchester consists of 4x high-rise tower blocks and we are proud to have been selected to provide the access package across all blocks.

Key Details

Main Contractor

Casey Group

Location

Manchester

Hire Duration

TBC weeks

Machine Selection

GEDA 1500Z/ZP ED (T/P) x2
TBC
The Haydon, London

We were proud to partner with Regal London for the supply of the access package for The Haydon, a residential development consisting of 87 luxury apartments in Central London.

The project required a combination twin hoist package consisting of a 2000kg Bocker Giant 20/38 Passenger & Goods hoist paired with a 1700kg Bocker LX2024 A42 Goods hoist with car sizes of 1.5m x 3.8m and 1.5m x 4.2m respectively.

In addition, a further 1000kg Bocker MX1024 A17 Goods hoist was supplied to serve the internal staircore of the building.

The hoists were installed progressively to meet the requirements of site and all machines were maintained by NTP over their 65 week hire duration.

The project at The Haydon, London, required a combination twin hoist package consisting of a Bocker Giant 20/38 and Bocker LX2024 A42, as well as a further Bocker MX1024 A17.

Key Details

Main Contractor

Regal London

Location

London

Hire Duration

65 weeks

Machine Selection

Bocker MX1024 A17 (G)
Bocker LX2024 A42 (G)
Bocker Giant 20/38 (P/G)
Canterbury Tower, Birmingham

Following the successful delivery of Salisbury Tower, NTP are pleased to have been selected to supply the access package for Canterbury Tower, another part of the £2.2 billion Ladywood regeneration scheme in Birmingham.

This busy site required high-capacity machines for the transport of goods as well as personnel to serve all 27 floors of the building. To meet this requirement, NTP were selected to supply 2x 2000kg Bocker Giant 20/38 Passenger & Goods hoists fitted with optional 3.40m wide C gates providing ease of access for large loads at gantry level.

NTP are pleased to have been selected to supply the access package for Canterbury Tower, a part of the £2.2 billion Ladywood regeneration scheme in Birmingham.

Key Details

Main Contractor

Equans

Location

Birmingham

Hire Duration

78 weeks

Machine Selection

Bocker Giant 20/38 (P/G) x2
City View, London

NTP were pleased to have been awarded the access package for this mixed-use renovation project in north-west London.

City View is an 8-storey mixed-use building providing commercial and residential accommodation, with car parking at basement level, and a roof terrace on the eighth floor. The building consists of 46 Residential Units and 2x commercial units on the ground floor.

Following the initial site survey, we were challenged with supplying a single hoist package to serve multiple opposing landings. This was achieved by supplying a modular Böcker MX1524 Transport Platform in A34 configuration with landing run-off ramps provided on both the A and B gate sides.

The use of this configuration provided the necessary access to all landings using a single hoist within a restricted site. We are happy to have worked with the site team to provide a successful access package for this project

NTP were please to have been awarded the access package for this mixed-use renovation project in north-west London, supplying a single hoist to serve multiple opposing landings.

Key Details

Main Contractor

Thomas Sinden

Location

London

Hire Duration

42 weeks

Machine Selection

Bocker MX1524 A34 (T/P)
M3 Building, Manchester

NTP were pleased to supply the access package for the refurbishment works at the M3 Building in Manchester for one of our valued customers.

For this application, our customer required a 1000kg goods hoist with low tie and base loadings. We provided one of our compact and versatile Bocker MX1024 goods hoists configured with a 1.4m wide C gate entry at ground level.

This machine provides a 1.7m x 1.4m platform size with a 1000kg SWL, allowing a range of materials to be transported safely to a number of landings. While not required for this project, the MX1024 is also available configured as a Transport Platform with optional extras such as a scaffold carrier and calling buttons where required.

As with all of our projects, large or small, NTP provided site specific installation drawings and loading calculations accompanied by a full risk assessment/ method statement following a detailed site survey.

For this application we provided our customer with one of our compact and versatile Bocker MX1024 Goods hoists configured with a 1.4m wide C gate entry at ground level.

Key Details

Main Contractor

Elite Scaffolding

Location

Manchester

Hire Duration

18 weeks

Machine Selection

Bocker MX1024 (G)
Holland Park Gate, London

We are proud to have been awarded the access package by Ardmore Group for the prestigious Holland Park Gate development. This project sees the development of 71 new luxury residences and 5* amenities on Kensington High Street in London.

The hoist package provided was a combination of machines to serve internal and external building works. This consisted of 2 650kg Böcker MX624 Goods hoists into the core of the building, with a 2000kg GEDA GmbH 1500Z Goods hoist supplying access to the basement and upper floors internally. Additionally, a 2000kg Bocker Giant 20/38 Passenger & Goods hoist provided exterior access to all levels.

Due to the restricted access, our experienced team of engineers were required to manually position the 2 MX624 machines within the lift cores.

We provided 2x 1000kg Bocker MX1024 Goods Hoists into the core of the new prestigious Holland Park Gate site, with a 2000kg GEDA 1500Z Goods hoist supplying access to the basement and upper floors.

Key Details

Main Contractor

Ardmore Group

Location

London

Hire Duration

84 weeks

Machine Selection

Bocker Giant 20/38 (P/G)
GEDA 1500Z/ZP ED (G)
Bocker MX624 (G) x2
Chatham Waters, Kent

NTP were delighted to be chosen by several partners to supply the hoist packages across multiple phases of the wider £600m mixed use Chatham Waters Regeneration scheme in Kent.

We supplied a total of 9 Transport Platforms across 8 blocks, serving multiple trades and providing both material and personnel access on site. The packages consisted of 2 GEDA 1500Z/ZP hoists in ‘GD’ configuration and 7 Bocker MX2024 B30 hoists, all with a SWL of 2000kg and platform sizes up to 1.65m x 4.35m.

NTP were delighted to be chosen by several partners to supply the hoist packages across multiple phases of the wider £600m mixed-use Chatham Waters Regeneration scheme in Kent.

Key Details

Main Contractor

O’Halloran & O’Brien

Location

Kent

Hire Duration

66 weeks

Machine Selection

GEDA 1500Z/ZP GD (T/P) x2
Bocker MX2024 B30 (T/P) x7
XQ7 Building, Manchester

NTP were pleased to be chosen by multiple contractors for the supply of hoists at the XQ7 regeneration project in Salford, Greater Manchester.

NTP are supplying a total package of 5 GEDA 1500Z/ZP ‘ED’ Transport Platforms across the project. These provide the capability for the transport of personnel and materials, with a SWL of 2000kg and the option to transport up to 7 people.

As part of a phased installation programme, the first hoists were installed from March 2023 and will continue in service until May 2025. As with all of our machines, these are installed, maintained and dismantled by our own dedicated team of service engineers that operate nationwide.

We are supplying a total package of 5 GEDA 1500Z/ZP ‘ED’ Transport Platforms across this project in Salford, Manchester, capable of transporting up to 7 people each or with a SWL of 2000kg.

Key Details

Main Contractor

Denholm Industrial

Location

Greater Manchester

Hire Duration

110 weeks

Machine Selection

GEDA 1500Z/ZP ED (T/P) x5