Call 01832 273 060 or click here to
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Following the successful delivery of Salisbury Tower, NTP are pleased to have been selected to supply the access package for Canterbury Tower, another part of the £2.2 billion Ladywood regeneration scheme in Birmingham.
This busy site required high-capacity machines for the transport of goods as well as personnel to serve all 27 floors of the building. To meet this requirement, NTP were selected to supply 2x 2000kg Bocker Giant 20/38 Passenger & Goods hoists fitted with optional 3.40m wide C gates providing ease of access for large loads at gantry level.