We are selected by contractors of all sizes to deliver work on a diverse range of projects nationwide
Recent Projects
With a track record of delivering vertical access solutions on a diverse range of projects nationwide, NTP are selected by contractors of all sizes to meet their requirements. Below are a selection of recent projects that we are proud to have been a part of.
One of the most prestigious buildings that we have worked on, the Old War Office is a Grade II* listed landmark at the heart of Whitehall, London.
At this site we offered a complete hoist package containing a variety of hoist types and capacities. In total we supplied 7 machines over a 2 year period. The largest machine configuration provided was a twin Bocker BK2038FC Passenger & Goods machine. These each have a lifting capacity of 2.2 tonnes with a variety of additional items available.
Our engineers installed Goods machines, Transport Platforms and Passenger & Goods hoists both inside and outside of the building. Bocker LX2024 hoists were configured as both A17 (1.5m x 1.7m) and A42 (1.5m x 4.2m) machines, and two of these were converted into Transport Platforms to suit the needs of this project.
As this project ran for over 2 years, with machines being installed and dismantled as and when required, we carried out monthly inspections to ensure the machines were all kept in good working order, given the duty cycle on site. Our engineers took great care around the old building and with continual servicing the technicians on site did not have to worry about unexpected call outs.
The former Ministry of Defence building was converted into a 125-room, world-class Raffles hotel, and 85 luxury residences. This 760,000 square foot development required a mixture of machine heights with a varying number of landings to achieve the access required by those on site, and we are proud to have supplied Ardmore with this project.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
This project in Lincoln for St Marks Accommodation made use of our various Transport Platforms and Goods machines. Over the course of 2 years, 11 hoists were supplied in total.
This site consisted of 10 accommodation blocks which resulted in 1372 new student rooms at the University of Lincoln. Due to the layout of the site, multiple machines were hired, covering most blocks and creating wider access across the development.
Due to requiring a versatile package of construction hoists, we provided our customer with a combination of Bocker MX2024 and GEDA 1500ZZP machines. These machines can easily be configured as either Goods only machines or Transport Platforms and site decided to have a mixture of both.
Overall, this project was a brilliant example of how multiple machines can provide efficient access to large developments. The site team were more than happy with the access package provided by NTP and we continue to work together on multiple different projects.
Key Details
Main Contractor
Location
Hire Duration
Machine Selection
Tasked with delivering a hoist system capable of lifting both personnel and materials, we provided the project at Tyndall Street, Cardiff with a twin configured GEDA Ph 27/37 machine. These impressive hoists handle up to 28 passengers or anything up to 2700kg each. These made easy work of moving a variety of materials from ground level to one of 24 floors.
Our customer took advantage of our Bluetooth calling system. This allows for smoother operation of the hoists over such a large number of landings and makes communication with the hoist driver much easier. Due to the height and number of landings it was also decided that the machine would be installed in multiple visits. This included installing the machine to level 6 initially and returning to site to add additional landing levels as the building progressed.
Despite the distance from our main offices we were able to provide excellent service. We have also secured future projects based on the service we provided.
Overall, the project at Tyndall Street, Cardiff was a success and we are proud to have supported this build.